The Happisburgh bell: a new concept, coming soon

After a long period getting funding and developing the design, the Happisburgh bell is at last taking real shape. Shown below is the radically different structure on which it will be mounted - a sled. Made of oak, it is a response to the continual erosion of the Happisburgh coastline, at somewhere around two to five meters a year.

The intention is that when the bell finds itself marooned at sea, it will be dragged inshore on the sled at its base. This is yet another commentary on the transience of this part of the coast, indeed of much of the East coast of the UK. For more information about coastal erosion in the area see here or here.

There is no date for installation yet, final permission is still required from the Marine Management Organisation, but there is a fair chance it will be in the Autumn of 2022. Until then the bell is a popular feature in residence at the local primary school.

Registered Company No: 11575853
Charity No: 1182967
Carbon emissions offset by
SoftPage
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram