Making the mounting and installing the bell

The design and construction of the mounting of the Harwich bell marks a departure for Time and Tide Bells. It is made entirely from oak, in fact an oak that was blown over near Marcus Vergette's studio in Devon. As a result it is extremely low in carbon content - very little steel. These photos are from the studio.

The installation was undertaken by partners Trinity House, a charity with a range of duties including General Lighthouse Authority, which amounts to maintaining lighthouses and buoys round the UK coast. It is based in Harwich.

Trinity House takes safety very seriously, so our cameraperson was not able to get very near the action!